Friday, September 23, 2011

1050mm Steam turbine blade (330MW/600MW)

Power plant Gas turbine blade
Steam turbine blade;
Industrial steam turbine blade;
Gas turbine compressor
turbine blade
Large size GAS/STEAM turbine blade
:

Main products(therm/nuclear power):

* Supercritical set: 600MW(L-0/L-1/L-2),length: 1050/1029mm;
* Conventional set: 300/600MW(L-0/L-1/L-2),length: 1000/905/900mm;
330MW(L-0/L-1/L-2),length: 1080mm;
300/600MW(L-0/L-1/L-2) precision forgings,length: 1016/851/909mm;
200MW(L-0/L-1),length: 855/668mm;
135MW(L-0/L-1/L-2),length: 710/690mm;
* Air cooling set: 300/600MW(L-0/L-1/L-2),length: 665/620mm;
600MW(L-0/L-1/L-2) precision forgings,length: 656mm;
50MW(L-0/L-1/L-2),length: 435/432mm;
* Combined cycle set: 150MW(L-0/L-1),length: 762/321mm;

Main forging equipment
: Max force of press: 6300ton,18000ton,35500ton.

Main machining Equipment:
CNC Deep Grinders;CNC Vertical Machining Centers;CNC Horizontal Machineing Centers;
5-Axis CNC Milling Machines;Robot Polishing Machine;6 Axis Belt Grinder;CNC Lathe,and so on.

Annual capacity:
Compressor blades: 100,000PCS;
Steam turbine blades(L-0/L-1): 50,000PCS;
Partitions & Buckers for MP/LP: 100,000PCS;
Total forging :15000ton.

Application
: power station,aviation and aerospace,railway transportation,Chemistry and steel industry and so on.

Main customers
: SIEMENS,ALSTOM,GE,NEP,CDF,MITSHIBUSHI,HITACHI etc.


No comments:

Post a Comment